Came back to the layout and found that cork mat had bubbled in a number of places. And the track had lifted in many places. Decided to strip everything back to the baseboard and relay the track. This would allow me to hide the wiring and to introduce an isolator to one section to allow a third power source. Made good progress over the last two days. Need to get a soldering iron in order to fix the wires. This will wait until Friday.
It is the MMDMRC exhibition on Saturday and I will be helping out all day.
Monday, 29 December 2008
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment